WINTER CAMPAIGN - Selected Record Power machines and accessories with Special prices! - CHECK HERE

READ MORE
Shipping Country

M5 Hammer Head Drop-in T-bolt

M5 Hammer Head Drop-in T-bolt
M5 Hammer Head Drop-in T-bolt

M5 Hammer Head Drop-in T-bolt

Select length

These T-bolts are perfect when you need to attach something to a V-slot rail. Due to the Drop-in shape the T-bolt do not need to be placed in from the ends of the extrusion. They can be easily placed in later in the building process!

0
0 reviews
0%
of customers recommend this product


M5 Hammer Head Drop-in T-bolt

€ 1,53 - € 1,94
excl. vat: € 79680.48
Number: 11139
Estimated delivery: 1-3 days
LEASING
Monthly installment:0
Leasing time:
Final acquisition price:2419.33
Only for companies. Requires VAT-number.

The calculations are based on the Grenke leasing price list, which does not include insurance. Insurance is compulsory and the customer can either purchase their own insurance or take it out with the same contract. Leasing financing is only granted to companies with a valid business ID.

Lease period 12-72 months.

Leasing prices VAT 0.

Option to redeem at the end for your own final delivery price, which will be shown under the product and in the summary. The minimum final delivery price is 70€ VAT 0.

After placing an order with leasing financing, you will receive within 1-2 days by email the contracts for electronic signature.

If you wish to use your own insurance, the leasing company will require a certificate of insurance showing the following:

  • Name of company
  • Insurance policy number
  • Information that the equipment under contract is insured, or information that the company has property insurance
  • Name/logo of insurance company
  • Insurance is in force/date of certificate of insurance
  • Insurance amount covers the value of the contract (month amount x time)

M5 Hammer Head Drop-in T-bolt

Select length

These T-bolts are perfect when you need to attach something to a V-slot rail. Due to the Drop-in shape the T-bolt do not need to be placed in from the ends of the extrusion. They can be easily placed in later in the building process!



Nettiverstas - Instagram
Nettiverstas - YouTube
Loading...